Creation time: 2021-05-18 15:52:51 Chongqing Longqiao Cogeneration Project Views: 20
The planned total installed capacity is one 300MW extraction condensing turbine generator set, two 50MW back pressure generator sets, and three 80MW back pressure generator sets. The total investment is RMB 3.1 billion and will be constructed in two phases, of which: two are constructed in the first phase. 50MW back pressure unit and a 300MW condensing unit. Supply materials: Φ10-273mm stainless steel tubes and fittings, 16~630mm carbon steel low and medium pressure boiler tubes, high pressure boiler tubes and fittings, alloy high pressure boiler tubes and fittings.